







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Bathroom Remodel Cost in Redmond?
A full bathroom remodel in Redmond typically runs $9,000 to $28,000. A smaller or partial redesign lands at $5,000 to $12,000. The written estimate sets the final price, and every project gets a free one from us before work starts. Call (425) 675-1664. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
That spread is wide because a bathroom is really several trades stacked in one small room. Demolition, rough plumbing, waterproofing, tile, electrical, cabinetry, and paint all have to happen in sequence, and the material choices you make at each step move the number. You’ve probably already priced out some of this online and seen the same range. What changes it is what goes into the room.
Key Takeaways
- Most Redmond bathroom remodels land between $9,000 and $28,000, with scope and material tier deciding where in that band you sit.
- A tile walk-in shower is the single largest line item in a typical project, and it’s also where waterproofing detail matters most.
- Material brand choices, from vanity fixtures to countertops, are yours to control, and we install from a deep roster rather than a single supply line.
- One contractor for demolition through final paint keeps the schedule tight and removes the handoff problem.

Bathroom Remodel Cost Breakdown (2026)
These are typical estimated ranges for the Redmond market. They’re a planning guide, not a quote. Your written estimate is what governs.
| Scope | Typical estimated range |
|---|---|
| Full bathroom remodel | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
Where you land in a range comes down to three things: how much of the layout changes, what tier of materials you choose, and how much of the room you’re touching. A vanity swap in a room that’s otherwise sound sits near $800. Gut a bathroom down to the studs, move the shower drain, add heated tile, and choose Cambria quartz for the vanity, and you’re at the top of the full remodel band.
The design decisions you make early matter most. Choosing a walk-in shower with a proper Schluter-system waterproofing layer costs more upfront than a prefabricated pan, but it’s the detail that keeps water where it belongs over the years. That’s a conversation worth having before demolition, not after. You can read more about the full scope of work on our bathroom remodel page.
What Affects Bathroom Remodel Pricing in Redmond
Cost is not just a function of the room’s square footage. Several things shift the number more than the floor plan does.
- Shower and tub scope. A tub-to-shower conversion (typically $3,500 to $10,000) usually costs less than a full custom walk-in shower because the plumbing rough-in stays put. Move the drain, add a bench, or frame a curbless entry, and the price climbs toward the top of the walk-in range.
- Tile and waterproofing detail. Tile is labor-heavy. Large-format tile over a properly prepped Schluter-system substrate is a different job than a simple 4-inch square install. Waterproofing done right is not an upcharge you should shop out.
- Fixture and finish tier. The brand you choose sets the price. A Proven mid-range American Standard or Moen fixture and a premium Toto or Grohe fixture solve the same problem at different costs. We install from a roster that spans all of it, so you’re choosing the fixture, not the supply line.
- Cabinetry and countertops. KraftMaid and Wellborn vanities (semi-custom and custom) anchor the low and high ends of cabinet pricing. A Cambria, Silestone, or Caesarstone counter adds a real material step over laminate.
- Hidden conditions behind the wall. Older plumbing, a failed supply line, a missing shutoff valve, or moisture-damaged framing underneath a tired surround. These surface at demolition and have to be priced to fix them right. Most Redmond homes built before the 1990s have at least one wrinkle behind the tile line.
- Layout changes. Moving a toilet, sink, or shower drain is plumbing work that a finish-only renovation never sees. A same-layout remodel stays in the middle of the estimate range; a relocated drain pushes it up.
One local note: a lot of Redmond housing stock is newer builds with builder-grade finishes, which means the first remodel in a home often includes more substrate and rough-in work than the owner expected. Nothing behind the tile is finished to the same standard as what you see in front of it.

How to Save on Bathroom Remodel
There’s nothing wrong with wanting the number down. These are the levers that actually move it, without cutting corners on the parts that matter.
- Keep the plumbing where it is. Keeping the toilet, shower, and sink drains in place is the single biggest saving in a bathroom remodel. Finish and fixtures change; drains don’t.
- Choose where to spend and where to save. Put the money into waterproofing and a real ventilation fan. Save on the countertop or the vanity brand. Nobody sees a Caesarstone vanity from the shower.
- Pick your brand tier deliberately. Between American Standard and Toto, or between a well-built mid-range faucet and a Grohe, the difference is real. Being able to choose is the point. You’ll get fixtures that match the budget you set, not the ones the contractor happens to carry.
- Phase the project if needed. A vanity installation now ($800 to $3,000) and the shower conversion later keeps cash moving in steps.
- Get the free estimate first. A written estimate before demolition is how you avoid the surprise line item. Call (425) 675-1664 and we’ll set it up.
One thing that never saves money: skipping waterproofing behind a tile shower or leaving a bathroom fan undersized. The money you trim there comes back as a repair.
Why Material Choice Matters More Than You Might Think
Bathroom budgets tend to break on the material list, not the labor list. Once the scope is set, the choices you make at the vanity, the counter, and the showerhead decide about a third of the total.
We work directly with KraftMaid and Wellborn on cabinetry, so a semi-custom vanity is a real option rather than a custom-order gamble. On counters, we’re authorized to install and recommend Cambria (American-made quartz), Silestone, and Caesarstone. Fixtures span eight brands, Kohler, Moen, Grohe, Delta, Blanco, American Standard, Toto, and Sterling, and each one solves a different problem at a different price point. A Kohler or Toto fixture is a step up in finish. A Moen or Delta fixture is a proven workhorse. Blanco sinks sit comfortably at the practical end. The point is that you’re choosing from real options instead of accepting whatever is stocked.
Flooring and finish work are handled in-house alongside the remodel. Schluter-system tile installations, interior and exterior painting, all under the same agreement as the bathroom. No handoff to a sub you’ve never met. That’s what one team, one contract, kitchen to curb actually means in practice.
If you’re working through the rest of the house at the same time, the same approach covers kitchen remodeling, flooring installation, and interior painting. It’s a rare Redmond project that stays confined to one room for long.
What a Typical Bathroom Remodel Looks Like, Step by Step
Knowing the sequence helps you understand where the money goes.
- Free estimate and site visit. We measure, assess the existing plumbing and substrate, and talk through your material tier and layout. The written estimate comes out of that visit.
- Demolition. Tile and fixtures come out. Hidden conditions show up here, and anything unexpected is priced before it’s fixed.
- Rough-in. Plumbing, electrical, and ventilation. Drain moves and new fan circuits happen at this stage.
- Waterproofing and substrate. The layer behind the tile. Schluter-system waterproofing goes in before any tile touches the wall.
- Tile and finish. Shower, floor, and wall tile. Vanity and counter set. Fixtures installed.
- Paint and cleanup. Final coat, hardware, and a walkthrough before we hand it back.
Smaller projects skip straight to finish work. A vanity installation doesn’t touch the rough-in. A shower replacement keeps the plumbing in place and moves to tile.
FAQs – Bathroom Remodel Cost
What does a full bathroom remodel cost in Redmond?
A full bathroom remodel in Redmond typically costs $9,000 to $28,000. Where you land depends on layout changes, material tier, and what’s behind the existing tile. The written estimate sets the final price. Call (425) 675-1664 for an exact quote. Estimates are free.
What does a small bathroom remodel cost?
A small bathroom remodel typically costs $5,000 to $12,000. Keeping the plumbing where it is and choosing mid-range fixtures like a Moen or Delta faucet keeps you in the lower half of that range. Call (425) 675-1664 for a free estimate on your room.
How much does a walk-in shower cost in Redmond?
A walk-in shower installation typically costs $4,500 to $12,000, and a tub-to-shower conversion lands at $3,500 to $10,000. A shower replacement alone is typically $3,000 to $8,500. Waterproofing detail on a tile shower is what separates the bottom from the top of that range. Call (425) 675-1664 to price your shower.
Is it cheaper to repair or replace a bathroom?
Repair is cheaper when the substrate and plumbing are sound. A shower replacement (typically $3,000 to $8,500) costs far less than a full remodel ($9,000 to $28,000). If moisture has already reached framing or there are multiple failures, replace is the better value. We’ll tell you which one applies after an estimate. Call (425) 675-1664. Estimates are free.
Can you remodel a bathroom in a day?
No. Even a vanity installation or cosmetic refresh involves multiple trades in sequence, and waterproofing needs to cure before tile. A smaller remodel takes far less than a full one, and we’ll give you a realistic schedule with the written estimate. Call (425) 675-1664 to start yours.
What does a bathroom vanity installation cost?
A bathroom vanity installation typically costs $800 to $3,000. The range reflects whether you’re setting a stock or semi-custom KraftMaid or Wellborn cabinet, whether you’re adding a Cambria, Silestone, or Caesarstone counter, and whether the plumbing under it has to move. Call (425) 675-1664 for a free estimate.
Material Brand Options Under One Contract
Part of what makes a bathroom budget manageable is the width of the material list. A vanity installation in a mid-range Redmond remodel may pair a Wellborn semi-custom cabinet with a Silestone top and Moen fixtures. The same room at the premium end gets a custom KraftMaid cabinet, Cambria quartz, and Toto or Grohe fixtures. Both are right; they’re just on different points of the curve. Being able to pick from the full spread is how the project stays on the number you set. Visit the home page to see the whole scope at Remodeling Redmond.
Nearby Cities
Redmond pricing translates closely to surrounding cities, with some variation. If you’re outside Redmond, the same careful estimate applies.
- bathroom remodel in Bellevue
- bathroom remodel in Kirkland
- bathroom remodel in Sammamish
- bathroom remodel in Issaquah
- bathroom remodel in Woodinville
- bathroom remodel in Bothell
- kitchen remodel in Bellevue
- interior painting in Kirkland
Start Your Bathroom Remodel With a Free Estimate
The number that matters is the one on your written estimate, not the range in a guide. A bathroom remodel in Redmond is a serious investment, and you deserve a clear scope, real material options, and one contractor who manages demolition through final paint. Every trade on the job is handled under one agreement, from Schluter-system tile work to the last coat of interior paint. Free estimates, upfront pricing, and a satisfaction guarantee. Call (425) 675-1664. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. We’re closed on Saturday. Our technicians have up to 13 years of experience. Same-day service is available.
Pricing reflects the Redmond market as of 2026. Remodeling Redmond offers free estimates – call (425) 675-1664.
Written by the team at Remodeling Redmond.
What Our Customers Say
"Allowances in the contract were realistic rather than artificially low to make the bid look good."
- Chris Miller"Weekly site meeting, every week, with a written summary afterward. I always knew where the money and the schedule stood."
- Todd Meyer"Ground up build. Permits, foundation, framing, all of it, and he ran the schedule tightly enough that the subs were never tripping over each other. Finished within a month of a fourteen month estimate."
- Shannon Sutton












