







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Construction Cost in Kenmore?
Construction in Kenmore typically runs $90,000 – $220,000 for a full ADU build, which is the largest single project most homeowners here take on. That said, a kitchen remodel usually costs $14,000 – $45,000, a bathroom remodel $9,000 – $28,000, and a roof replacement $8,000 – $20,000. Those are estimated ranges for the Kenmore market in 2026. The written estimate sets the final price, and every project we quote gets one before work starts.
We’re Remodeling Redmond, a residential remodeling company that handles kitchens, bathrooms, flooring, painting, and the exterior envelope under one contract. Our technicians have up to 13 years of experience. If you’d rather get a number than read a guide, call (425) 675-1664 for a free estimate.

2026 Construction Price Guide for Kenmore
Here’s what the work typically costs in Kenmore this year, broken down by project type. All figures are estimates; the written estimate is what governs.
| Project | Typical Estimated Range |
|---|---|
| ADU Construction | $90,000 – $220,000 |
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
| Roof Replacement | $8,000 – $20,000 |
| Roof Repair | $400 – $1,800 |
| Metal Roof Installation | $15,000 – $40,000 |
| Tile Roof Repair | $600 – $2,500 |
| Window Replacement | $4,500 – $15,000 |
| Paver Driveway Installation | $7,000 – $18,000 |
| Concrete Driveway Installation | $4,500 – $12,000 |
| Asphalt Driveway Paving | $3,500 – $9,000 |
| Driveway Replacement | $5,000 – $14,000 |
| Driveway Sealing | $250 – $700 |
| Paver Patio Installation | $3,500 – $11,000 |
| Vinyl Fence Installation | $3,500 – $9,000 |
| Aluminum Fence Installation | $4,000 – $10,000 |
Why the spreads are so wide
The gap between the low and high end of each range mostly comes down to materials, not labor. A bathroom remodel that stays in the $9,000 range and one that reaches $28,000 can involve the same footprint and the same fixtures count. What changes is whether the vanity is a stock piece or a semi-custom KraftMaid, whether the shower tile is a basic ceramic or a large-format porcelain set on a Schluter system, and whether the plumbing trim is American Standard or Grohe.
We keep a roster of brands across every category so the tier is your call, not ours: KraftMaid and Wellborn for cabinets, Cambria, Silestone, and Caesarstone for countertops, and Kohler, Moen, Grohe, Delta, Blanco, American Standard, Toto, and Sterling for plumbing. That matters in Kenmore because the housing stock is mixed; a 1950s rambler off 68th Avenue and a newer build near the Burke-Gilman trail have very different starting points and very different upgrade paths.
What Affects Construction Pricing in Kenmore
- Age and condition of the house. Much of Kenmore’s housing was built between the 1950s and 1980s. Opening a wall in a mid-century home often reveals galvanized plumbing, undersized wiring, or insulation that needs replacing. Those surprises add to a project’s cost, and a good contractor builds a contingency into the estimate rather than pretending the wall will be clean.
- Permits and inspection timelines. Additions, ADUs, and garage conversions require permits through the City of Kenmore, and the review adds both cost and calendar time. Structural changes need engineering. We pull permits as part of the scope, and the fee shows up in the estimate so there’s no surprise later.
- Wet, sloped lots and drainage. Kenmore sits between Lake Washington and the Sammamish River, and a lot of properties hold moisture longer than homeowners expect. Additions and driveway work often need footing drains, grading corrections, or better stormwater handling before the visible work starts.
- Roof and envelope exposure. The Pacific Northwest wet season runs long. Roof replacements here lean toward shingle systems from GAF, CertainTeed, Owens Corning, IKO, Atlas, or Tamko, with attention paid to underlayment and ventilation because those are what actually keep the deck dry. Metal roofing costs more upfront ($15,000 – $40,000) but handles the climate differently.
- Material tier. This is the biggest lever you control. Cambria quartz versus a mid-range laminate on the same cabinet run can swing a countertop budget by thousands. We quote the tier you want and show you what the next one up or down actually buys.
- Scope boundaries. A project that stops at the kitchen counter is one number. A project that also repaints the adjoining rooms, replaces the flooring, and re-trims the hallway is a different number. Bundling scope under one contract is usually cheaper than hiring four separate trades who each mark up their own overhead.

How to Save on Construction in Kenmore
There are real ways to bring a project down without cutting corners on things you’ll regret later.
- Keep the plumbing and gas where they are. Moving a sink or a range across a room means new supply lines, new drains, and often a permit revision. A layout that works with the existing rough-in saves thousands in both labor and inspection hassle.
- Pick your splurge and hold the line elsewhere. If Cambria quartz on the island is the thing you’ll notice every day, choose a mid-range cabinet line and put the money into the counter. The reverse works too.
- Bundle scope. Doing the bathroom remodel and the interior painting together means one mobilization, one protection setup, one punch list. It’s less expensive than two separate projects a year apart.
- Handle the envelope before the cosmetics. A roof repair in the $400 – $1,800 range done now protects the interior finishes you’re about to pay for. Chasing a leak after a $30,000 kitchen is a bad trade.
- Get a written estimate with a contingency line. A quote that assumes nothing hidden will be found is either naive or padded. A clear estimate with a named allowance for surprises lets you plan for the range instead of the best case.
- Ask about material alternatives. We can show you what Silestone versus Caesarstone actually looks like in your lighting, or whether a Wellborn semi-custom cabinet is worth the step up from a stock line. Comparing real options beats guessing.
Free estimates are part of how we work. Call (425) 675-1664 and we’ll set up a time to walk the project and put numbers on paper.
What a construction estimate should actually contain
A good estimate breaks the project into phases and names the materials in each. Cabinets, countertops, plumbing trim, tile, paint, and fixtures get called out by brand and line so you know exactly what you’re buying. Labor is separated so you can see where the hours go. Permits, disposal, and any allowances are line items, not buried in a lump sum. If a contractor hands you a single number with no breakdown, ask for the detail before you sign.
Construction Timeline: What to Expect in Kenmore
Timing varies by scope, but the shape of a residential project is fairly predictable. A small bathroom remodel can run a few weeks. A full kitchen remodel runs longer, especially once cabinet lead times and countertop templating are factored in. Additions and ADUs run months, and permit review through the City of Kenmore adds time before the first nail goes in.
We sequence the work so trades don’t stand on top of each other. Demolition, rough-in, inspection, insulation, drywall, tile, cabinets, countertops, trim, and paint happen in that order for a reason. Rushing the sequence is how you end up redoing a backsplash because the outlets landed in the wrong spot. One project manager stays on the job from demolition to final coat, so you’re not relaying information between four different people.
Why One Contractor Across the Whole Scope Matters
Most Kenmore homeowners we work with are juggling a kitchen, a bathroom, flooring, and painting in one renovation, sometimes with a roof or siding repair folded in. Hiring a separate cabinet installer, countertop fabricator, plumber, tile setter, painter, and roofer means six schedules, six contracts, and six people pointing at each other when something doesn’t line up.
We cover that scope under a single project agreement. Cabinets, countertops, plumbing fixtures, tile, flooring, and paint all come through one team. On the exterior side, we handle James Hardie siding, roofing systems from GAF, CertainTeed, Owens Corning, IKO, Atlas, and Tamko, Therma-Tru doors, and window lines including PGT, CGI, ES Windows, ECO Window Systems, and ViewLux. That means an interior remodel and an envelope upgrade can be planned together instead of sequenced by two companies who never talk.
If you’re at the research stage and comparing remodelers, you can read more about how we approach projects on our Remodeling Redmond page.
Kitchen and Bathroom: Where Most of the Budget Goes
For most Kenmore homes, the kitchen and bathrooms absorb the majority of a remodel budget, and that’s where material choices have the most leverage.
A kitchen remodel at $14,000 – $45,000 covers a range from a modest refresh to a full gut with new layout. Cabinet installation alone runs $4,000 – $13,000 depending on the line and the number of boxes. Countertop installation is $2,000 – $6,500, and the difference between a basic slab and a Cambria quartz with a waterfall edge lives inside that spread. A backsplash is $800 – $2,500, and an island adds $3,000 – $10,000.
Bathrooms follow the same pattern. A full bathroom remodel is $9,000 – $28,000, a small one $5,000 – $12,000. A walk-in shower installation runs $4,500 – $12,000; a tub-to-shower conversion $3,500 – $10,000; a straight shower replacement $3,000 – $8,500. Vanity installation is $800 – $3,000. Tile work on a Schluter system is worth the line item here. Waterproofing is what stands between a nice bathroom and a mold problem two winters from now, and Kenmore’s damp climate doesn’t forgive shortcuts.
Exterior Work and What It Adds to a Project
Exterior improvements are often bundled with interior remodels because the access and the staging overlap. A roof replacement runs $8,000 – $20,000 for shingle systems; a metal roof installation is $15,000 – $40,000. Roof repairs are smaller: $400 – $1,800 for most shingle repairs, $600 – $2,500 for tile. Window replacement is $4,500 – $15,000. Driveways and patios fall in a similar band: paver driveway $7,000 – $18,000, concrete driveway $4,500 – $12,000, asphalt paving $3,500 – $9,000, driveway replacement $5,000 – $14,000, and sealing $250 – $700. A paver patio is $3,500 – $11,000. Fencing runs $3,500 – $9,000 for vinyl and $4,000 – $10,000 for aluminum.
Tile roof repair and shingle repair are the two calls where we recommend a trained professional look at it rather than a homeowner climbing up. Roof work involves height and, on steeper pitches, real fall risk. The same goes for anything involving the electrical panel or gas lines during a remodel; those get a licensed trade, not a DIY attempt.
When to Repair and When to Replace
The honest answer depends on the component. A roof with a handful of missing shingles is a $400 – $1,800 repair. A roof that’s failing across multiple planes and showing deck damage is a replacement, and putting repair money into it just delays the inevitable. A shower with a cracked pan is often a replacement rather than a re-tile, because the leak is usually behind the wall. A driveway with surface cracks can be sealed for $250 – $700. One that’s heaved and broken needs replacement at $5,000 – $14,000.
The question to ask is whether the repair buys you meaningful time or just postpones a larger bill. If the answer is the latter, replacement is usually the better use of the money.
FAQs – Construction Cost in Kenmore
How much does a kitchen remodel cost in Kenmore?
A kitchen remodel in Kenmore typically costs $14,000 – $45,000, with small kitchen remodels running $9,000 – $20,000. Cabinet installation is $4,000 – $13,000, countertops $2,000 – $6,500, and a backsplash $800 – $2,500. Call (425) 675-1664 for an exact quote; estimates are free.
How much does a bathroom remodel cost in Kenmore?
A bathroom remodel in Kenmore typically costs $9,000 – $28,000, and a small bathroom remodel runs $5,000 – $12,000. A walk-in shower installation is $4,500 – $12,000, a tub-to-shower conversion $3,500 – $10,000, and a vanity installation $800 – $3,000. Call (425) 675-1664 to get a written estimate for your bathroom.
How much does an ADU or home addition cost in Kenmore?
An ADU in Kenmore typically costs $90,000 – $220,000, a home addition $45,000 – $130,000, and a garage conversion $30,000 – $80,000. Permits, site conditions, and whether the unit includes a full kitchen and bath drive the range. Call (425) 675-1664 for a project-specific quote.
Is it cheaper to repair or replace a roof in Kenmore?
Roof repair in Kenmore typically costs $400 – $1,800, while a full roof replacement runs $8,000 – $20,000. If the damage is isolated, repair is almost always cheaper. If the roof is failing in multiple areas, replacement saves money over the next several years. Call (425) 675-1664 and we’ll tell you which side of that line your roof is on.
Can you come out and look at my project soon?
Yes. We answer 24/7, and fast dispatch runs from 7am to 7pm, Sunday through Friday. Most estimates get scheduled within days of the call. Reach us at (425) 675-1664 to set up a free estimate.
What to Do Next
If you’re planning a remodel in Kenmore, the useful next step is a conversation about scope and materials, not a guess from a website. We’ll walk the space, talk through the brand options that fit your budget, and give you a written estimate with line items you can actually compare against another bid. Call (425) 675-1664. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Pricing reflects the Kenmore market as of 2026. Remodeling Redmond offers free estimates – call (425) 675-1664.
Written by the team at Remodeling Redmond.
What Our Customers Say
"Allowances in the contract were realistic rather than artificially low to make the bid look good."
- Chris Miller"Weekly site meeting, every week, with a written summary afterward. I always knew where the money and the schedule stood."
- Todd Meyer"Ground up build. Permits, foundation, framing, all of it, and he ran the schedule tightly enough that the subs were never tripping over each other. Finished within a month of a fourteen month estimate."
- Shannon Sutton












